Green Power Certificate Creation

What is the Green Power Certificate System?

Green Power Certificates are certificates
that prove the "environmental value" of electricity
generated from renewable energy sources

Recommended For

  • Those wanting to use the off-site installation subsidy

    Green Power Certificates are required for the Tokyo Metropolitan Government's "Local Production for Local Consumption Renewable Energy Equipment Installation (Off-site)" subsidy program

  • Those with renewable energy equipment operating for 2+ years

    The J-Credit system requires equipment installed within 2 years, so Green Power Certificates are recommended for equipment operating for 2+ years

Green Power Certificate Creation Process STEPS

Issuing Green Power Certificates
requires the use of a certified issuing organization

Equipment Certification

  • STEP 1

    Participation review / Preparation

  • STEP 2

    Issuing organization selection

  • STEP 3

    Equipment application

  • STEP 4

    Equipment certification

Power Volume Certification

  • STEP 5

    Power measurement

  • STEP 6

    Power volume application

  • STEP 7

    Power volume certification

  • STEP 8

    Certificate issuance

Why Choose OFFSEL for Green Power Certificates MERIT

Industry-lowest fees

Create certificates at half the fee
of our competitors

We handle Tokyo Metropolitan
"Off-site Installation Subsidy" applications

We can handle the subsidy application for the Tokyo Metropolitan Government's "Local Production for Local Consumption Renewable Energy Equipment Installation (Off-site)" program

Green Power Certificate
Overview A program where the Tokyo Metropolitan Government subsidizes part of the equipment installation costs for businesses installing renewable energy equipment within the TEPCO service area (excluding Tokyo)
Subsidy
Amount
  • SMEs (Renewable energy: up to 2/3 of eligible costs; Storage batteries: up to 3/4 of eligible costs)
  • Other businesses (Renewable energy: up to 1/2 of eligible costs; Storage batteries: up to 2/3 of eligible costs)
Eligibility
Requirements
  • Must not have received FIT (Feed-in Tariff) or FIP (Feed-in Premium) equipment certification
  • Storage batteries must be stationary (portable types not eligible)
  • Environmental value obtained must be certified and self-consumed at a Tokyo business location
  • Storage batteries must be stationary (portable types not eligible)

Fully delegate the work

By delegating all the work required for environmental value creation,
you can reduce the typical 4+ month process to just 1 month

Pricing

Pricing is provided on a case-by-case basis
depending on project type and scale.
Please feel free to contact us.

Contact Us Free